تجاوز إلى المحتوى الرئيسي
أضيفت بواسطة webmaster بتاريخ 9 August 2026

ڤيتوتوب يو ال 173

أرضيات ذاتية التسوية، ثنائية المكونات، خالية من المذيبات، قائمة على البولي يوريثان، تتميز بسطح خشن ومقاوم للانزلاق، ومخصصة للمناطق الباردة.

Vetotop UL173 is a two-component, solvent-free, polyurethane-based, self-leveling flooring system specially designed for cold areas requiring a durable, rough-textured and slip-resistant surface. It provides excellent resistance to abrasion, impact and temperature variations while maintaining strong adhesion to properly prepared cementitious and metal substrates.

الاستخدامات

  • Cold storage rooms and refrigerated facilities
  • Refrigerated trailer and vehicle manufacturing facilities
  • Industrial kitchens and food-processing plants
  • Production areas exposed to moisture or frequent cleaning
  • Loading bays, workshops, corridors and service areas
  • Areas requiring a durable and slip-resistant flooring finish

المزايا

  • Provides a durable, rough-textured and slip-resistant finish
  • Suitable for cold areas and refrigerated environments
  • Withstands service temperatures from −20°C to +70°C
  • Excellent abrasion, impact and wear resistance
  • Strong adhesion to properly prepared concrete and metal substrates
  • Solvent-free
  • Easy to clean and maintain
  • Resistant to frequent washing and general industrial service conditions

تعليمات الاستخدام

All surfaces should be dry and free from contamination, such as oil, grease, loose particles, decayed matter, moss algal growth, laitance, and all traces of mold release oils and curing compounds. This is best achieved by lightly gritblasting the surface. Where moss, algae, or similar growths have occurred, treatment with a proprietary biocide should be carried out after the grit-blasting process. Spalled and deeply disintegrated concrete should be removed to sound concrete and repaired with a Saveto repair system.

All surfaces receiving Vetotop UL173 should be primed with Vetoprime UP394, designed for maximum absorption and adhesion to concrete substrates. Add the entire contents of the hardener tin to the base tin and mix the two primer components thoroughly for at least 3 minutes - only mix full packs. Once mixed, the primer should be applied immediately to the prepared substrate using stiff brushes and/or rollers. The primer should be well ‘scrubbed’ into the substrate to ensure full coverage. Still, take care to avoid over-application or ‘ponding.’ Allow the primer to dry before proceeding to the next stage, do not proceed whilst the primer is ‘tacky’ as this will lead to unsightly marks in the finished surface. Porous substrates may require a second primer coat - when the first coat is directly absorbed into the substrate - but observe a minimum over-coating time.

Vetotop UL173 is supplied in two pre-weighed packs (base and hardener), ready for immediate on-site use. Part mixing of these components is not acceptable and will affect both the performance and appearance of the finished floor. Mixing should be carried out using either a forced action mixer; or a heavy-duty mobile mixer fitted with a jiffy type mixing paddle. All such equipment should be of a type and capacity approved by Saveto. The components should be mixed in a suitably sized mixing vessel. Stir the base and hardener components individually, then empty them into the mixing vessel scrapping the edges and mix for 3-4 minutes until a completely homogeneous material is obtained.

Ensure sufficient labor and materials to make the mixing and subsequent application process a continuous one for any given, independent floor area. Once mixed, use the material within its specified pot life. Pour the material onto the prepared and primed substrate as soon as mixing is complete. 

Spread it to the required thickness using a notched trowel or a gauged spreader, taking care not to overwork the resin, spreading evenly and slowly. After laying, roll the material immediately, using a spiked nylon roller to remove slight trowel marks and assist air release. Use a ‘back and forth’ technique along the same path for rolling. An overlap of 50% with adjacent paths is recommended. Further light rolling may be required to remove surface imperfections or for subsequent release of trapped air but should be done before the setting of the product.

Allow the applied flooring to cure under dry conditions. The initial drying time is approximately 3 – 6 hours. Protect the surface from moisture, traffic, and mechanical loads until fully cured. Full service performance is achieved after 7 days under standard conditions (25°C).

All tools and application equipment should be cleaned immediately after use with Vetonit Solvent XX400. Hardened or cured material can only be removed by mechanical means.

تحميل

استكشف المزيد من المنتجات

ڤيتوتوب يو سي 363

غشاء عزل مائي بولي يوريثان لأرضيات المرور

ڤيتوتوب اي سي 498

طلاء إيبوكسي خالٍ من المذيبات.

كويك فلور فيكس

مونة إصلاح إسمنتية سريعة التصلب.